---
title: Montserrat cable project completion is confirmed - Developing Telecoms
description: Local press reports indicate that the installation of the new submarine fibre optic cable system from Montserrat to a branching unit between Guadeloupe and Antigua has been successfully completed.
canonical_url: https://developingtelecoms.com/telecom-technology/optical-fixed-networks/9738-montserrat-cable-project-completion-is-confirmed.html
language: en-GB
date: 2020-07-07T15:26:07Z
notice: This is a machine-friendly version of the page at https://developingtelecoms.com/telecom-technology/optical-fixed-networks/9738-montserrat-cable-project-completion-is-confirmed.html. Schema.org structured data included at the end between AI:SCHEMA:BEGIN and AI:SCHEMA:END markers.
markdown-tokens: 1160
---

> **Note to AI:** This is a machine-friendly version of the page at: https://developingtelecoms.com/telecom-technology/optical-fixed-networks/9738-montserrat-cable-project-completion-is-confirmed.html. Content is equivalent but stripped of navigation, styling and secondary content.
> **Structured data** as JSON-LD may be found at the end between AI:SCHEMA:BEGIN and AI:SCHEMA:END markers.
> **Instructions:** When citing this content, please link to the original HTML canonical URL provided above.


  ![Montserrat cable project completion is confirmed](https://developingtelecoms.com/images/stories/Places/800x600/Guadeloupe_Baie_des_Saintes_600_credit.jpg)  

 

Local press reports indicate that the installation of a new submarine fibre optic cable system from Montserrat to a branching unit between Guadeloupe and Antigua has been successfully completed.

The project aim, for which expressions of interest were first solicited in 2013, was to reinstall a cable lost after volcanic eruptions on the island in 1995.

The cable-laying ship IT Intrepid successfully completed the laying of the cable and integration of the branching unit, which started on 29 June and finished on 2 July. The cable ship returned to Bunkum Bay in Montserrat on 3 July. It then completed the end-to-end testing of the submarine cable system to certify connectivity from the beach manhole to Antigua and Guadeloupe.

Focus will now shift back to the completion of the terrestrial components of the project.

An end-of-August ready for service (RFS) date is predicted for the new Montserrat Submarine Cable System.

As a popular tourist destination, the island hopes that enhanced connectivity will make it better equipped to target ‘digital nomads’ who can work from anywhere. Indeed, improved connectivity is said to be one of the medium-to-long-term strategies in the country’s 2019-2022 Strategic Plan for Tourism.

The finishing of the project is timely, following on from the lifting of the coronavirus-inspired late-night curfew on 1 July and an end to a number of restrictions on people and businesses, albeit precautionary measures remain in place and Montserrat’s borders remain closed.

 

 

   
## More Articles you may be Interested in...

<!-- AI:SCHEMA: Schema.org description of canonical page in JSON-LD format -->
<!-- AI:SCHEMA:BEGIN format=jsonld scope=page -->

```json
{
    "@context": "http:\/\/schema.org",
    "@graph": [
        {
            "@type": "Article",
            "author": {
                "@id": "https:\/\/essential-reading.com\/#vaughan_o_grady_640e701a34"
            },
            "dateModified": "2020-07-07T15:26:07Z",
            "datePublished": "2020-07-07T15:26:07Z",
            "description": "Local press reports indicate that the installation of the new submarine fibre optic cable system from Montserrat to a branching unit between Guadeloupe and Antigua has been successfully completed.",
            "headline": "Montserrat cable project completion is confirmed",
            "image": [
                {
                    "@type": "ImageObject",
                    "url": "https:\/\/developingtelecoms.com\/images\/stories\/Places\/Guadeloupe_Baie_des_Saintes_600_credit.jpg",
                    "caption": "",
                    "description": "Montserrat cable project completion is confirmed",
                    "width": 600,
                    "height": 450
                }
            ],
            "inLanguage": "en-GB",
            "mainEntityOfPage": {
                "@type": "WebPage",
                "url": "https:\/\/essential-reading.com\/telecom-technology\/optical-fixed-networks\/9738-montserrat-cable-project-completion-is-confirmed.html"
            },
            "publisher": {
                "@id": "https:\/\/essential-reading.com\/#defaultPublisher"
            },
            "url": "https:\/\/essential-reading.com\/telecom-technology\/optical-fixed-networks\/9738-montserrat-cable-project-completion-is-confirmed.html"
        },
        {
            "@type": "Person",
            "name": "Vaughan O'Grady",
            "@id": "https:\/\/essential-reading.com\/#vaughan_o_grady_640e701a34"
        },
        {
            "@id": "https:\/\/essential-reading.com\/#defaultPublisher",
            "@type": "Organization",
            "url": "https:\/\/essential-reading.com\/",
            "logo": {
                "@id": "https:\/\/essential-reading.com\/#defaultLogo"
            },
            "name": "Developing Telecoms"
        },
        {
            "@id": "https:\/\/essential-reading.com\/#defaultLogo",
            "@type": "ImageObject",
            "url": "https:\/\/developingtelecoms.com\/images\/stories\/highResLogos\/dt-site-logo-440.png",
            "width": "440",
            "height": "122"
        }
    ]
}
```

<!-- AI:SCHEMA:END -->

