---
title: ViaTunisia segment of Medusa subsea cable is now live - Developing Telecoms
description: Orange announced on Wednesday that the France-to-Tunisia route of the Medusa Submarine Cable System – dubbed “ViaTunisia” – is now operational, establishing a new digital link between Europe and North Africa.
canonical_url: https://developingtelecoms.com/telecom-technology/optical-fixed-networks/20341-viatunisia-segment-of-medusa-subsea-cable-is-now-live.html
language: en-GB
date: 2026-06-04T04:18:57Z
notice: This is a machine-friendly version of the page at https://developingtelecoms.com/telecom-technology/optical-fixed-networks/20341-viatunisia-segment-of-medusa-subsea-cable-is-now-live.html. Schema.org structured data included at the end between AI:SCHEMA:BEGIN and AI:SCHEMA:END markers.
markdown-tokens: 1154
---

> **Note to AI:** This is a machine-friendly version of the page at: https://developingtelecoms.com/telecom-technology/optical-fixed-networks/20341-viatunisia-segment-of-medusa-subsea-cable-is-now-live.html. Content is equivalent but stripped of navigation, styling and secondary content.
> **Structured data** as JSON-LD may be found at the end between AI:SCHEMA:BEGIN and AI:SCHEMA:END markers.
> **Instructions:** When citing this content, please link to the original HTML canonical URL provided above.


Orange announced on Wednesday that the France-to-Tunisia route of the Medusa Submarine Cable System – dubbed “ViaTunisia” – is now operational, establishing a new digital link between Europe and North Africa.

Orange – which serves as the landing party in both [Marseille](https://developingtelecoms.com/telecom-technology/optical-fixed-networks/19175-afr-ix-telecom-announces-medusa-cable-s-first-landing.html) and Bizerte – said that ViaTunisia extends directly into Orange's global infrastructure in Marseille via a fully redundant urban fibre ring connecting all the data centres in the city.

“By combining the resilience, security and performance of a global backbone with Marseille's role as a leading interconnection hub, ViaTunisia provides direct, high-capacity connectivity between North Africa and the wider digital world,” Orange said in a statement.

ViaTunisia also multiplies route options in this area, especially in natural disaster-prone areas, which improves overall network resilience, the telco added.

The 1,050-km ViaTunisia link was co-financed by the European Union under the Connecting Europe Facility (CEF Digital) program. Under the EUR10 million grant agreement signed by Orange in December 2022, the CEF funding covered 30% of construction and management costs.

The CEF is also co-financing [the Medusa system](https://developingtelecoms.com/telecom-technology/optical-fixed-networks/15198-medusa-cable-promises-cross-mediterranean-connectivity-boost.html), along with Orange and AFR-IX Telecom. The 8,760km Medusa system features 17 landing points in Cyprus, France, Greece, Italy, Malta, Portugal, and Spain on the north Mediterranean coast, and Algeria, Egypt, Libya, Morocco, and Tunisia on the south coast, with a design capacity of 480 Tbps on 24 fibre pairs.

<!-- AI:SCHEMA: Schema.org description of canonical page in JSON-LD format -->
<!-- AI:SCHEMA:BEGIN format=jsonld scope=page -->

```json
{
    "@context": "http:\/\/schema.org",
    "@graph": [
        {
            "@type": "Article",
            "author": {
                "@id": "https:\/\/essential-reading.com\/#john_tanner_b807895845"
            },
            "dateModified": "2026-06-04T04:18:57Z",
            "datePublished": "2026-06-04T04:18:23Z",
            "description": "Orange announced on Wednesday that the France-to-Tunisia route of the Medusa Submarine Cable System – dubbed “ViaTunisia” – is now operational, establishing a new digital link between Europe and North Africa.",
            "headline": "ViaTunisia segment of Medusa subsea cable is now live",
            "image": [
                {
                    "@type": "ImageObject",
                    "url": "https:\/\/developingtelecoms.com\/images\/stories\/NewsPix\/Medusa_Marseille_91025.jpg",
                    "caption": "",
                    "description": "ViaTunisia segment of Medusa subsea cable is now live",
                    "width": 601,
                    "height": 450
                }
            ],
            "inLanguage": "en-GB",
            "mainEntityOfPage": {
                "@type": "WebPage",
                "url": "https:\/\/essential-reading.com\/telecom-technology\/optical-fixed-networks\/20341-viatunisia-segment-of-medusa-subsea-cable-is-now-live.html"
            },
            "publisher": {
                "@id": "https:\/\/essential-reading.com\/#defaultPublisher"
            },
            "url": "https:\/\/essential-reading.com\/telecom-technology\/optical-fixed-networks\/20341-viatunisia-segment-of-medusa-subsea-cable-is-now-live.html"
        },
        {
            "@type": "Person",
            "name": "John Tanner",
            "@id": "https:\/\/essential-reading.com\/#john_tanner_b807895845"
        },
        {
            "@id": "https:\/\/essential-reading.com\/#defaultPublisher",
            "@type": "Organization",
            "url": "https:\/\/essential-reading.com\/",
            "logo": {
                "@id": "https:\/\/essential-reading.com\/#defaultLogo"
            },
            "name": "Developing Telecoms"
        },
        {
            "@id": "https:\/\/essential-reading.com\/#defaultLogo",
            "@type": "ImageObject",
            "url": "https:\/\/developingtelecoms.com\/images\/stories\/highResLogos\/dt-site-logo-440.png",
            "width": "440",
            "height": "122"
        }
    ]
}
```

<!-- AI:SCHEMA:END -->

